Flooring insight

Karndean Flooring: A 6-Step Procurement Checklist from a Cost Controller

2026-08-21 · Emilia Novak

I'm a procurement manager at a 40-person property services company. I've managed our floor covering budget for the past six years, which means I've tracked every square foot we bought, every charge I missed, and every installer who told me 'that wasn't in the original quote.' I'm not a brand ambassador for Karndean. I'm the person who reads the spec sheet, calculates total cost, and keeps the backup documentation.

This checklist is for facilities managers, specifiers, and anyone who has to buy Karndean flooring without getting burned. Use it before you request quotes, and definitely before you approve an order. There are six steps, and step three will take the most time.

Step 1: Define the actual conditions before you look at samples

I start with the building, not the sample board. What is the traffic level? Are there rolling carts or heavy equipment? Is the slab concrete or wood? Is there a moisture risk? What about acoustics and exit heights?

One mistake from my first year: I approved a glue-down Karndean product for a ground-floor slab without reading the moisture test results from the general contractor. The slab wasn't within the manufacturer's requirements. The repair cost more than the floor. Had I asked 'what's the slab moisture?' and 'is there an underlayment already specified?' I would have caught it.

Write down these conditions in the spec before you get pricing. If you're uncertain, ask the installer or a floor underlayment supplier for their recommended assembly. The goal is to match the product to the reality of the site.

Step 2: Choose the Karndean series and tile format before you shop around

Karndean has multiple design flooring ranges, and the construction can vary by series. Some products are designed as glue-down, some use a click locking system, and some are loose lay. Thickness, wear layer, backing, and installation methods are not identical across the brand. That's why you can't spec by brand name alone.

If you're specifying Karndean Knight Tile, know what 'tile' means in that range. It's a small-format tile designed to imitate stone or ceramic. The joint and grout details depend on the exact product construction. I had a project where the architect assumed the tile was self-spacing and the grout was optional. The spec sheet said otherwise. For me, that was a $450 change order that could have been avoided with one phone call.

To be fair, Knight Tile isn't the only groutable LVT on the market. But the point is to verify the exact product, not the category. The current Karndean technical data sheet will list the recommended joint width, grout type, and installation method for that specific series.

Step 3: Get the total cost, not the tempting price per square foot

This is the lesson that shaped my entire process. In my first few years, I almost chose a vendor because their per-square-foot price looked significantly lower. It wasn't until a contractor asked about adhesive, transition strips, and freight that I realized the 'cheap' option would cost more.

In Q2 2024, I compared two quotes for a Karndean locker room floor on one of our projects. Vendor A quoted a higher product price but included adhesive and freight in the line-item detail. Vendor B had a lower product price. After adding adhesive, freight, and a required underlayment, Vendor B was 17 cents per square foot more expensive. Across a 4,200-square-foot space, that's $714 we didn't waste. The surprise wasn't the material cost. It was the underlayment.

I've learned to ask 'what's NOT included' before 'what's the price.' Here's the list I now run through for every quote:

  • Adhesive, grout, or sealant
  • Underlayment, if the product doesn't have an attached backing
  • Transition strips, reducers, and quarter rounds
  • Delivery, freight, and lift-gate charges
  • Pallet minimums and warehouse handling fees
  • Subfloor prep or moisture mitigation
  • Removal and disposal of old flooring
  • Product storage time if the material arrives before the crew

I built a cost calculator after getting burned on hidden freight charges twice. Now every line item goes into a spreadsheet before I compare bids. The vendor who lists all fees upfront, even if the total looks higher, usually costs less in the end.

Step 4: Verify the current spec sheet, not the sales brochure

Product evolution is real. I pulled Karndean's public spec sheets in January 2025 to double-check the products on a current hospital project. The wear layer, thickness, and warranty documentation had changed from the older brochure sitting in our library. If I had submitted that old spec, we would have had a long conversation with the general contractor.

Ask the dealer for these documents before you approve anything:

  • The current data sheet with an issue date
  • The exact product code, range name, and tile/plank size
  • The installation manual from the manufacturer
  • The warranty document and the claims procedure
  • VOC emission certification and slip resistance test data

A laminate flooring catalog can be a useful comparison reference for wear and impact performance, but don't copy laminate requirements into an LVT specification. They are different products with different thickness, flexibility, and installation tolerances. The Karndean spec needs to stand on its own.

Step 5: Coordinate with your floor underlayment supplier early

Underlayment is the easiest line item to forget because the material may or may not be included in the product box. Some Karndean click ranges have an attached underlayment. Others need a separate layer. The choice affects total height, door clearances, transitions, and performance over certain subfloors.

Coordinate with your floor underlayment supplier before you finalize the floor spec. Tell them the exact Karndean product, the subfloor condition, and whether it's glue-down or click. A good supplier will flag compatibility issues before they become change orders. In 2023, I specified a product that required a separate underlayment, but the installer didn't bring it. The project stopped for two days. That was a pure procurement miss.

If you're using a click-lock product, ask whether the underlayment is part of the plank backing or a separate roll. If it's separate, add it to the quote and the schedule. If it's attached, make sure the transition strips match the total floor height.

Step 6: Inspect full-size samples and archive the approved reference

Small samples look different under store lighting. If the project allows, order full-size tiles or planks and place them on the actual substrate, under the actual lighting, next to the existing trim and wall colors. For Karndean Knight Tile, check the joint and grout detail before you approve the sample. The grout color can change the whole look.

Keep a sealed sample with the approved quote in your office. In 2023, our team used a sample to verify a delivered batch. The pattern direction wasn't what we specified. The sample made the claim easy to prove. Without it, we would have argued over a color interpretation for weeks.

One more thing: keep flooring specifications in their own section of the project manual. If your office uses a separate architectural coating specification guide, don't bury floor covering requirements inside it. Flooring is a separate system with its own installation, moisture, and underlayment requirements. It deserves to be referenced clearly.

Common mistakes that cost money

Here are the usual culprits from my side of the purchase order:

  • Assuming every Karndean product is waterproof. Not every product is marketed as waterproof. The exact wording, warranty, and care instructions depend on the series. Read the current product literature.
  • Skipping subfloor prep. The product is only as good as the slab and substrate. A trained installer and a proper moisture test are not optional.
  • Choosing the lowest per-square-foot quote without the full line-item list. Hidden fees never take the day off.
  • Ordering transitions and reductions too late. They are not included in the box by default. Check every quote.
  • Not writing down the exact reference number. If you don't record the collection, color, product code, and lot number, you will have trouble on reorders.

There's something satisfying about seeing the final line item match the number I put in the budget six months earlier. It doesn't happen by accident. It happens because I follow a checklist, ask for transparency, and verify before I commit. That's the whole job.

Emilia Novak
Emilia Novak

Emilia Novak is a flooring and architectural-surfaces analyst covering ceramic and porcelain tile, natural stone, resilient flooring, underlayments, countertops, adhesives, grout, and installation accessories. She uses ASTM C373 and ASTM C648 test evidence while comparing water absorption, breaking strength, slab flatness, substrate moisture, joint width, slip resistance, and installed tolerances. Her specification guides help architects, contractors, and buyers match surface systems to traffic, wet-area exposure, maintenance demands, and substrate conditions.